After letting the first fiberglass / epoxy layer cure for about 20 hours, I quickly installed the radio and speakers to make sure the epoxy covering wire run was still functional. I was a little worried that I had cut one of the wires when trimming away the excess fiberglass, but all was well. Next, I put down a second coat of unthickened epoxy to fill the fiberglass weave. This was applied with a thin nap roller. This second coat was also supposed to cover the rest of the hull (#2/3 panels and rails). I rolled it on where I could and used a brush on the rails. Getting into all the rail spacers with a brush and epoxy was tedious, especially when trying to curb epoxy runs.
Time Spent: 2.5 Hours
Total Time In Build: 113.0 Hours
Recent Comments