Installing the Daggerboard Trunk

Posted by Zachary Wiest in Epoxy

I have long had the daggerboard trunk complete, but today it was time to install it.  I spent a good amount of time making sure it was on centerline and plumb before drilling any holes.  The trunk is epoxied to the bottom panel and to the center frame.  Countersunk screws running through those pieces ensure it is strong.  I covered up the screw heads with wood flour thickened epoxy which I will sand smooth later.

Time Spent: 1.5 Hours

Total Time In Build: 123.0 Hours

Leave a Reply

the rank way